[1]谢中凯,叶居东.传力洞在拱坝坝肩加固中的应用研究—以葫芦口水电站为例[J].浙江水利科技,2017,(04):029-32.[doi:10.13641/j.cnki.33-1162/tv.2017.04.009]
 XIE Zhong-kai,YE Ju-dong.Application Research of Arch Dam Abutment Reinforcement Using Concrete Plug——A Case Stnely of Hulukou Hydropower Station[J].Zhejiang Hydrotechnics,2017,(04):029-32.[doi:10.13641/j.cnki.33-1162/tv.2017.04.009]
点击复制

传力洞在拱坝坝肩加固中的应用研究—以葫芦口水电站为例
分享到:

《浙江水利科技》[ISSN:1008-701X/CN:33-1080/TV]

卷:
期数:
2017年04
页码:
029-32
栏目:
出版日期:
2017-07-25

文章信息/Info

Title:
Application Research of Arch Dam Abutment Reinforcement Using Concrete Plug——A Case Stnely of Hulukou Hydropower Station
作者:
谢中凯1 叶居东2
1. 浙江省水利河口研究院, 浙江 杭州 310020;
2. 浙江大学水工结构与水环境研究所, 浙江 杭州 310058
Author(s):
XIE Zhong-kai1 YE Ju-dong2
1. Zhejiang Institute of hydraulics & Estuary, Hangzhou 310020, Zhejiang, China;
2. Institute of Hydro-Structure and Water Environment Research, Zhejiang University, Hangzhou 310058, Zhejiang, China
关键词:
拱坝坝肩处理传力洞三维有限元分析坝肩稳定
Keywords:
arch dam abutment treatmentconcrete plug3D finite element analysisstability of dam abutment
分类号:
TV122+.1
DOI:
10.13641/j.cnki.33-1162/tv.2017.04.009
文献标志码:
A
摘要:
拱坝坝肩地质条件对拱坝的正常运行至关重要,拱坝失事很少是由于拱坝自身问题引起,大部分是由坝肩失稳造成的。在拱坝基础较差的情况下,传力洞是一种有效的加固措施。目前,传力洞已广泛运用于坝肩处理中,但是其研究明显落后于应用。因此,研究复杂地质条件下拱坝坝肩的稳定意义重大。以葫芦口水电站为研究对象,依据有限元分析软件ANSYS计算结果,使用刚体极限平衡法验证传力洞对拱坝坝肩的增稳效果,认为传力洞能够改善拱坝的受力情况,并提升坝肩基岩的稳定性。
Abstract:
Geological conditions of the dam abutment are very important to the normal operation of the arch dam,the arch dam accidents are rarely due to their own problems,they are mostly caused by the instability of the dam abutment.In the case of poor dam foundation,concrete plug will be an effective reinforcement method.At present,concrete plug has been widely used,but the research on it is far behind the application.Therefore,the study on the stability of arch dam abutment under complicated geological conditions would be of great significance.In this paper,based on the results of Hulukou hydropower station calculated by finite element analytical software ANSYS,the rigid limit equilibrium method is applied to testify the effect of concrete plug on arch dam.The result shows that concrete plug could improve the force situation of arch dam and the stability of dam abutment.

参考文献/References:

[1] 王毓泰,周维垣,毛健全,等.拱坝坝肩岩体稳定分析[M]. 贵阳:贵州人民出版社,1982.
[2] 潘家铮.建筑物的抗滑稳定和滑坡分析[M].北京:水利水电出版社,1980.
[3] 袁志刚,马连军,钟秀灵.混凝土拱坝坝肩抗滑稳定三维非线性有限元分析[J].人民长江,2010,41(2):9-27.
[4] 章青,陈爱玖,王大伟.基于非线性有限元法的高拱坝坝肩岩体抗滑稳定分析[J].水利学报,2007,38(S1):84-87.
[5] 马连军,钟秀灵,梁慧兰.复杂地基上混凝土拱坝三维非线性有限元稳定分析[J].水电能源科学,2010,28(4):75-77.
[6] 张宜虎,尹红梅,王亮清.鱼简河拱坝坝肩岩体稳定性分析[J].岩石力学与工程学报,2005,24(18):3305-3310.
[7] 田儒琴.拱坝坝肩岩体重量和渗透压力计算的探讨[J].湖南水力发电,2007,(3):8-11.