[1]伍远康,俞锡根,刘福瑶.基于保证率要求的水库供水限制水位核定方法[J].浙江水利科技,2017,(05):013-16,23.[doi:10.13641/j.cnki.33-1162/tv.2017.05.004]
 WU Yuan-kang,YU Xi-gen,LIU Fu-yao.Checking and Ratification Method of Water Level Limitfor Reservoir Water Supply Based on Guarantee Rate Requirement[J].Zhejiang Hydrotechnics,2017,(05):013-16,23.[doi:10.13641/j.cnki.33-1162/tv.2017.05.004]
点击复制

基于保证率要求的水库供水限制水位核定方法
分享到:

《浙江水利科技》[ISSN:1008-701X/CN:33-1080/TV]

卷:
期数:
2017年05
页码:
013-16,23
栏目:
出版日期:
2017-09-25

文章信息/Info

Title:
Checking and Ratification Method of Water Level Limitfor Reservoir Water Supply Based on Guarantee Rate Requirement
作者:
伍远康 俞锡根 刘福瑶
浙江省水文局, 浙江 杭州 310009
Author(s):
WU Yuan-kang YU Xi-gen LIU Fu-yao
Hydrology Bureau of Zhejiang Province, Hangzhou 310009, Zhejiang, China
关键词:
水库供水限制水位核定
Keywords:
reservoirwater level limit of water supplychecking and ratification
分类号:
TV697
DOI:
10.13641/j.cnki.33-1162/tv.2017.05.004
文献标志码:
A
摘要:
为使承担生产、生活、生态供水的水库,真正做到按保证率要求供水,以典型水库为例,采用直接寻优的模式搜索法,在正常水位与死水位之间,核定满足各自供水保证率要求的生产供水限制水位和生活供水限制水位,从而将兴利库容分为生活、生产、生态供水区,其中生活、生产供水优先,供水不能满足时削减生态用水;生活、生产供水区,其中生活用水优先,供水不能满足时削减生产用水;生活供水区,只有供水不能满足时才削减供水。经长系列供需平衡计算表明,按核定的限制水位供水能够满足各自保证率供水要求。
Abstract:
Reservoirs undertake the role of water supply for production,living and ecological purposes. Taking atypical reservoir as an example,direct optimization model is used to check and ratify the water level limit between normal water level and dead water level in order to make sure the reservoir water is supplied according to the guarantee rate for different purposes. Therefore,the reservoir capacity can be divided into living, production and ecological water supply zones according to the advantageous storage capacity. Among them,living and production water supply have priority over ecological water,i.e.when the water supply for the two kinds is not satisfied,ecological water has to becut. Living water supply is prior to production water supply,and production water has to becut when living water supply is not satisfied. As forliving water supply zones,the water supply is cut only when water supply is not satisfied. The long series supply and demand balance calculation shows that water supply based on guarantee rate requirement can be satisfied according to the checked and ratified water level limit.

参考文献/References:

[1] 钟平安.防洪限制水位研究的几点思考[J].河海大学学报(自然科学版),2002,30(6):1-5.
[2] 上海市政工程设计研究院.GB 50013——2006室外给水设计规范[S].北京:中国计划出版社,2006.
[3] 谢政,李建平,陈挚.非线性最优化理论与方法[M].北京:高等教育出版社,2010.
[4] 葛守西.现代洪水预报技术[M].北京:水利水电出版社,1999.

相似文献/References:

[1]陈晓蕾,王冠.浙江省珊溪水利枢纽纳污能力分析[J].浙江水利科技,2011,(03):002.
[2]陈国伟,卢晓燕.水库项目取水水资源论证探讨[J].浙江水利科技,2011,(06):016.
[3]刘娟娟,彭洪.水库土坝除险加固中滑坡事故的处理与防范[J].浙江水利科技,2011,(04):064.
[4]张庆曹,陈光跃,潘忠斌,等.基于水生态的水库藻类预防对策——以浙南山区水库为例[J].浙江水利科技,2011,(04):085.
[5]陈波,罗子夏.浙江省水库绿色饮水工程研究[J].浙江水利科技,2012,(02):031.
[6]郑国诞,陈刚,胡金春,等.滩涂水库堤前波要素计算及断面试验研究[J].浙江水利科技,2012,(05):001.
[7]刘超英,吕颖.瞬态瑞雷波勘探技术在水库工程勘察中的应用[J].浙江水利科技,2012,(05):059.
[8]王磊,俞建军.浙江省水库饮用水源地保护政策机制初探[J].浙江水利科技,2013,(04):025.
[9]梁亮,宋立松,张泽锋,等.基于SKYLINE的水库三维管理系统[J].浙江水利科技,2013,(04):070.
 LIANG Liang,SONG Li-song,ZHANG Ze-feng,et al.SKYLINE-based 3D Reservoir Management System[J].Zhejiang Hydrotechnics,2013,(05):070.
[10]王挺,宋立松,方琛亮,等.基于Google Map的水库安全生产监管系统[J].浙江水利科技,2013,(03):007.
 WANG Ting,SONG Li-song,FANG Chen-Liang,et al.Google Map-based Monitoring System for Reservoir’s Safe Operation[J].Zhejiang Hydrotechnics,2013,(05):007.

备注/Memo

备注/Memo:
收稿日期:2017-04-20。
作者简介:伍远康(1957-),男,教授级高级工程师,大学本科,主要从事水文、水资源及水环境研究工作。E-mail:wuyk130@263.net
更新日期/Last Update: 2017-09-28