[1]舒全英,陈成,郑雄伟.浙江海山潮汐电站增容改造动能计算分析[J].浙江水利科技,2017,(06):023-26.[doi:10.13641/j.cnki.33-1162/tv.2017.06.006]
 SHU Quan-ying,CHEN Cheng,ZHENG Xiong-wei.Kinetic Energy Estimation and Analysis of Zhejiang Haishan Tidal Power Station[J].Zhejiang Hydrotechnics,2017,(06):023-26.[doi:10.13641/j.cnki.33-1162/tv.2017.06.006]
点击复制

浙江海山潮汐电站增容改造动能计算分析
分享到:

《浙江水利科技》[ISSN:1008-701X/CN:33-1080/TV]

卷:
期数:
2017年06
页码:
023-26
栏目:
出版日期:
2017-11-25

文章信息/Info

Title:
Kinetic Energy Estimation and Analysis of Zhejiang Haishan Tidal Power Station
作者:
舒全英 陈成 郑雄伟
浙江省水利水电勘测设计院, 浙江 杭州 310002
Author(s):
SHU Quan-ying CHEN Cheng ZHENG Xiong-wei
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power, Hangzhou 310002, Zhejiang, China
关键词:
海山潮汐电站增效扩容动能计算
Keywords:
Haishan Tidal Power Stationefficiency improvement and capacity expansionkinetic energy estimation
分类号:
TV744
DOI:
10.13641/j.cnki.33-1162/tv.2017.06.006
文献标志码:
A
摘要:
海山潮汐电站是我国迄今为止唯一的双库、单向、全潮发电和库区水产养殖综合开发的小型潮汐电站,电站经过多年的运行,机组设备老化以及库区淤积,亟需进行增效扩容。潮汐电站发电原理与常规的水电站类似,但计算过程与电站开发利用方式有不同并有较大的差别。以海山潮汐电站为例探讨双库单向潮汐电站动能计算,为其增容改造装机规模确定提供参考依据。
Abstract:
Zhejiang Haishan Tidal Power Station is the only small tidal power station which has double reservoirs,one way flow and full tide time hydroelectric generation combined with aquaculture.It’s necessary to improve efficiency and expand capacity because of the equipment aging and sedimentation in reservoir after years of operation.The law of power generation of tidal power station is similar with normal hydropower station,but its calculations and kinds of utilization are not same,sometimes with big divergence.The calculation of tidal electric energy of double reservoir was discussed by using the example of Haishan Tidal Power Station,and offered the reference of efficiency improvement and capacity expansion project.

参考文献/References:

[1] 李书恒,郭伟,朱大奎.潮汐发电技术的现状与前景[J].海洋科学,2006,30(12):82-86.
[2] 范波芹,索丽生,周杰.重视潮汐电站的开发与利用[J].水电能源科学,2001,19(2):71-73.
[3] 林楚平.海山潮汐能的综合开发利用[J].水利水电技术,1999, 30(1):33-34.
[4] 舒全英,卢晓燕,郑雄伟.潮汐电站动能计算及软件开发与应用[J].水力发电学报,2015,34(6):65-70.
[5] 王传崑,卢苇.海洋能资源分析方法及储量评估[M].北京:海洋出版社,2009.
[6] 卢晓燕,舒全英,郑雄伟.潮汐电站动能计算研究研究技术报告[R].杭州:浙江省水利水电勘测设计院,2014.
[7] 潘利国,舒全英,郑雄伟.浙江省玉环县海山潮汐发电科技改造试验项目(一期)工程初步设计报告[R].杭州:浙江省水利水电勘测设计院,2014.

相似文献/References:

[1]张树存,谢丽华.富阳市岩石岭水库一级水电站 水轮发电机组增效扩容设计[J].浙江水利科技,2012,(02):044.
[2]郎敏,邱方荣,李一平.宣平溪二级水电站增效扩容水轮发电机组的选择[J].浙江水利科技,2014,(06):076.

备注/Memo

备注/Memo:
收稿日期:2017-05-18。
作者简介:舒全英(1983-),男,工程师,硕士,主要从事水利规划设计工作。E-mail:shuquanying@qq.com
更新日期/Last Update: 2017-11-28